Build where you couldn't before
When a site is capped on water, power or space, Gco Tech's shallow geothermal wells cover the hottest hours your cooling can't, turning a non-viable data center site into a viable one.

When a site hits a hard limit
We don't replace your coolers. We make the build possible when one of these limits would otherwise stop it.
Peak shortfall
Your cooling comes up short on the hottest afternoons, especially after adding denser AI racks.
Water cap
A permit limit, city restriction or drought stage rules out evaporative or water-spray top-up.
Power cap
A fixed electrical service, a long utility queue or summer peak charges make every peak kW count.
No room outside
Noise rules, historic buildings or dense sites leave no space for more outdoor equipment.
How It Works
Our patent pending shallow geothermal wells turn the ground under your site into a silent, water-free heat sink for peak hours.

- 1
A Gco Tech Well Cell
About 10 shallow closed-loop wells, 300–500 ft deep, drilled under a parking lot or the building slab. Nothing above ground but a pump skid.
- 2
Peak trim
On hot afternoons, warm return water from your liquid-cooling loop is routed through the wells and comes back cooler.
- 3
The ground recovers
Overnight and through winter your existing cooling carries the load while the rock around the wells cools back down.
- 4
Optional heat pump boost
Where power allows, a heat pump lifts how much heat each well can take on the worst days.
Three ways to deploy
Pick the option that matches the limit your site is up against.
Option 1
Passive wells
For sites capped on both power and space
- No compressor, near-zero added peak power
- Wells underground, pump skid only
- Lowest cost
Option 2
Hybrid
For sites partly capped on power and space
- Runs passively most hours
- Heat pump switches on only for the worst hours
- Guaranteed capacity on the hottest days
Option 3
Continuous heat pump
For sites capped on water or space, not power
- Most cooling from each well
- Can serve as a small site's only cooling
- Zero water use
What could your site gain?
Describe your site's limits, choose an option, and see how much peak cooling, extra IT capacity and money a Gco Tech Well Cell could unlock.
Pick one to see which options fit your site. Click again to clear.
The IT heat your current cooling can't handle on the hottest afternoon. We size the Well Cell to cover it.
Matters most for Options 2 and 3, which run a heat pump.
For GPUs, about your $/GPU-hour, since each GPU draws roughly 1 kW.
Your numbers stay private. They're used only to calculate this estimate and are never saved, logged or shared.
Estimated annual savings
—
Indicative estimate for Texas sites based on Gco Tech's engineering model. Actual performance depends on local geology, confirmed with a thermal response test on a pilot well. Not an offer or guarantee.
Who it's for
Owners of their own sites adding a few hundred kilowatts of AI or high-density compute.
Hospitals
On-site imaging and clinical AI in older buildings on dense campuses.
Universities
Research computing clusters where the building's power and space are maxed out.
Government
Emergency operations and control rooms that value hardened, no-outdoor-equipment sites.
Industry & energy
Plants and field operations adding AI where water or power is scarce.
We also partner with modular data center builders and engineering firms that design high-density retrofits.
Have a site that's stuck?
Tell us about the limit you're up against. We'll run the numbers for your location and scope a pilot well.
Our team will get back to you within 24 hours.
Get in Touch
Tell us about your site and the limit you're up against: water, power, space or peak cooling. We'll follow up to schedule a consultation.