Build where you couldn't before
When a site is capped on water, power or space, Gco Tech's shallow geothermal wells cover the hottest hours your cooling can't, turning a non-viable data center site into a viable one.
When a site hits a hard limit
We don't replace your coolers. We make the build possible when one of these limits would otherwise stop it.
Peak shortfall
Your cooling comes up short on the hottest afternoons, especially after adding denser AI racks.
Water cap
A permit limit, city restriction or drought stage rules out evaporative or water-spray top-up.
Power cap
A fixed electrical service, a long utility queue or summer peak charges make every peak kW count.
No room outside
Noise rules or dense sites leave no room for more outdoor equipment. The wells sit below grade in a strip you can still use: a landscape bed, service yard or parking edge.
How It Works
Our patent pending shallow geothermal wells turn the ground beside your building into a silent, water-free heat sink for peak hours.

- 1
A Gco Grove™
Typically 10 to 15 shallow closed-loop wells, 300–500 ft deep, sized to your site and drilled right next to your building. Nothing above ground but a small pump skid.
- 2
Peak trim
On hot afternoons, warm return water from your liquid‑cooling loop is routed through the wells and comes back cooler.
- 3
The ground recovers
Overnight and through winter your existing cooling carries the load while the rock around the wells cools back down.
- 4
Optional heat pump boost
Where power allows, a heat pump lifts how much heat each well can take on the worst days.
Three ways to deploy
Pick the option that matches the limit your site is up against.
Option 1
Passive wells
For sites capped on both power and space
- No compressor, near‑zero added peak power
- Wells underground, pump skid only
- Lowest cost
Option 2
Hybrid
For sites partly capped on power and space
- Runs passively most hours
- Heat pump switches on only for the worst hours
- Sized for the hottest days
- Eligible for the 30% federal tax credit
Option 3
Continuous heat pump
For sites capped on water or space, not power
- Most cooling from each well
- Can serve as a small site's only cooling
- Eligible for the 30% federal tax credit
A 30% federal tax credit
Gco Grove projects with a heat pump, Options 2 and 3, can qualify for the federal investment tax credit for geothermal heat pump property.
30% of the installed cost
Projects under 1 MW get the full 30% without extra wage and apprenticeship rules. A Gco Grove is well under that size.
Cash back for public and nonprofit owners
Nonprofit hospitals, public universities and local governments can receive the credit as a direct payment through elective pay.
Full rate through 2032
The 30% rate applies to projects that begin construction by the end of 2032. It steps down to 26% in 2033 and 22% in 2034, then ends.
Option 1 has no heat pump, so under current IRS rules it likely doesn't qualify on its own. Adding a heat pump (Option 2 or 3) is what makes a project eligible.
Gco Tech does not provide tax, legal or accounting advice, and nothing on this site is tax advice. We evaluate each project against its own conditions and design it to qualify for the highest incentive available under current regulations. Confirm eligibility with your own tax advisor.
Learn more from the IRS: Clean energy tax credits · Investment tax credit guide (PDF)
What could your site gain?
Describe your site's limits, choose an option, and see how much peak cooling, extra IT capacity and money a Gco Grove™ could unlock.
Pick one to see which options fit your site. Click again to clear.
The IT heat your current cooling can't handle on the hottest afternoon. We size your Gco Grove to cover it.
Electricity your site can spare for added cooling on the hottest afternoon. Matters most for Options 2 and 3, which run a heat pump.
For GPUs, about your $/GPU-hour, since each GPU draws roughly 1 kW.
Your numbers stay private. They're used only to calculate this estimate and are never saved, logged or shared.
Peak cooling delivered
—
Indicative estimate for Texas sites based on Gco Tech's engineering model. Actual performance depends on local geology, confirmed with a thermal response test on a pilot well. Not an offer or guarantee.
Who it's for
Owners of their own sites adding a few hundred kilowatts of AI or high‑density compute.
Hospitals
On-site imaging and clinical AI in older buildings on dense campuses.
Universities
Research computing clusters where the building's power and space are maxed out.
Government
Emergency operations and control rooms that need hardened sites with no outdoor equipment.
Industry & energy
Plants and field operations adding AI where water or power is scarce.
We also partner with modular data center builders and engineering firms that design high‑density retrofits.
What a pilot proves
We're lining up our first pilot sites in Texas. Each one starts with a single test well, so you see measured results from your own ground before committing to a full Gco Grove.
Heat per foot of well
A thermal response test on the pilot well measures how many watts per foot your ground can take, the number that sizes the Grove.
Peak kW, measured
Metered cooling delivered across the hottest afternoons, compared with what your current system can do alone.
Water and power avoided
Gallons of cooling-tower water and kilowatts of chiller power you didn't need, logged over the season.
Interested in hosting one of the first pilots? Tell us about your site.
Have a site that's stuck?
Tell us about the limit you're up against. We'll run the numbers for your location and scope a pilot well.
We'll get back to you within a day.
Get in Touch
Tell us about your site and the limit you're up against: water, power, space or peak cooling. We'll follow up to schedule a consultation.